Projects Civic

Court of Four Winds

Marrakech, Morocco. Completed 2024.

A public library around a shaded court, where the reading rooms are 6 °C cooler than the street.

Gross floor area
4,200 m²
Reading places
420
Court
24 × 24 m
Operational energy
34 kWh/m²/yr
Embodied carbon
188 kgCO₂e/m²
Peak cooling saved
6 °C below street

The idea

The four wings differ in height. The south wing is low, so the court gets winter sun. The west wing is the tallest, so it shades the court on summer afternoons.

A gap in the east wing pulls the evening breeze from the Atlas into the court. The reading rooms open onto it through deep timber screens.

The walls are rammed earth, 60 cm thick. They delay the heat of the day by about nine hours, so the building releases it at night, when nobody is reading.

Drawings

Court of Four Winds, site planABCDEFGH123456789N020 m

Material passport

What the building is made of, and what happens to each material when it comes down.

MaterialWhere it is usedEnd of life
Rammed earthLoad-bearing wallsReturns to the ground
CedarScreens and shuttersReusable
Zellige tileCourt floor, made 40 km awayReusable
Lime plasterInterior wallsBiodegradable

Timeline

  1. 2019Brief
  2. 2020Concept
  3. 2021Technical design
  4. 2022On site
  5. 2024Completion