Twin Gauge
Rotterdam, Netherlands. On site, completion 2028.
Two office towers joined by a garden bridge, spaced so that each keeps the other's winter light.
- Gross floor area
- 52,000 m²
- Height
- 96 m and 79 m
- Sky bridge
- 36 m span, planted
- Operational energy
- Target 38 kWh/m²/yr
- Embodied carbon
- Target 320 kgCO₂e/m²
- Spatial daylight autonomy
- Target 74%
The idea
The two towers were going to be one block. Splitting it in two let daylight into the centre of the plan, where most office buildings are dark.
We set the 34-metre gap from the angle of the sun at noon in February. That is the darkest month in which people still expect to work by daylight.
The bridge at level 18 holds the shared amenities and a garden with mature trees, planted in soil that came from the excavation of the foundations.
Drawings
Material passport
What the building is made of, and what happens to each material when it comes down.
| Material | Where it is used | End of life |
|---|---|---|
| Steel frame | Bolted, no welding | Dismantled and reused |
| Hollow-core slabs | Floors | Lifted out and reused |
| Unitised glass façade | Leased from the manufacturer | Returned under contract |
| Site soil | Bridge garden | Living |
Timeline
- 2023Competition
- 2024Concept
- 2025Planning approval
- 2025Technical design
- 2026On site
- 2028Completion