From a site address to a building you can measure.

We take projects from first feasibility to a year after handover. You can also bring us in for a single stage, or only for daylight and environmental design.

How a project runs

  1. Sun study

    1 week, free

    A year of sun and shadow on your site, with the hours each neighbour takes away. You keep the drawings whatever you decide.

  2. Feasibility

    3 to 5 weeks

    How much can be built, where, and what it will cost to run. We test the brief as hard as the site.

  3. Concept design

    6 to 10 weeks

    Massing, plans and the first façade studies, all checked against the solstice sun. You see three options and choose one.

  4. Planning

    8 to 16 weeks

    The application, with the daylight and overshadowing studies that planners ask for, drawn so that neighbours can read them.

  5. Technical design

    12 to 24 weeks

    Every detail, specification and material passport entry, coordinated with the engineers in one shared model.

  6. Construction

    Length of the build

    Weekly site visits, quality checks and a running record of what goes into the building, ready for the passport.

  7. Year-one review

    1 month, one year after handover

    We measure energy, comfort and daylight, compare them with our targets and fix what can be fixed.

Ways to work with us

IncludedFull serviceDesign onlyDaylight consultancy
Best forClients who want one team from start to finishClients with their own delivery architectOther architects and developers
Stages01 to 0701 to 0401, plus reviews at 03 and 05
Material passportIncludedOutlineNot included
Year-one reviewIncludedOptionalOptional
Fee basisPercentage of construction costFixed fee per stageFixed fee per study

Questions clients ask first

Is the sun study really free?

Yes. It takes us a week, and it tells us quickly whether we are the right office for your site. You keep the drawings either way.

Do you work outside your three cities?

Yes. About half our projects are in other countries. We partner with a local architect for planning and site supervision where the law requires it.

Does designing for daylight cost more?

It adds about a week to concept design. It usually removes late changes to façades and plan depths, which are the expensive ones.

What is a material passport?

A register of every significant component in the building, how it is fixed and how it can be removed and reused. It is handed over with the keys.

How soon can you start?

We can usually start a sun study within two weeks and a feasibility study within a month.